Developer Checklist for Staging to Production Push (1)

Internal ITSOFT engineers only. Complete after pushing Staging changes to Production.

This field is for validation purposes and should be left unchanged.
Internal developer checklist. Complete this form for every Staging-to-Production push. Tick each item only after it has been verified. A second engineer must independently sign off in section 7.

1. Push Details

DD slash MM slash YYYY
Push Time(Required)
:

2. Pre-Push Checklist

Tick each item only after it has been verified.
Pre-Push Items

3. Backups Captured (Required Evidence)

4. Push Process Checklist

Tick each step actually performed during the push.
Push Process Items

5. Post-Push Verification

Critical gate - any unchecked item blocks the push from being signed off.
Post-Push Items

6. Issues and Notes

Rollback Performed?(Required)

7. Independent Reviewer Sign-Off

A second ITSOFT engineer must independently verify the post-push state of production.
Reviewer Confirmation

8. Attachments

Attach push screenshots (Cloudways success screen, robots.txt, smoke test, etc.)
Drop files here or
Accepted file types: jpg, jpeg, png, gif, webp, pdf, doc, docx, xlsx, xls, csv, txt, Max. file size: 100 MB, Max. files: 10.
    Allowed: images (jpg, png, gif, webp), PDFs, docs (doc, docx, xlsx, csv, txt). Up to 10 files.